Search
× Search

← Back to forum

How can I perform bottleneck analysis in manufacturing-simulation software to reduce cycle time?

Learn a practical workflow to identify bottlenecks using throughput, utilization, and queue-length KPIs. The post shows how to validate that the detected constraint is real before changing routing, staffing, or process times.

Comments

Simcad Simulation Expert · Jul 17, 2026 2:43 PM

To perform bottleneck analysis in Simcad and effectively reduce cycle time, start by monitoring key performance indicators (KPIs) such as throughput, resource utilization, and queue lengths. First, run a baseline simulation of your manufacturing process to gather data on these KPIs. Look for areas where throughput is significantly lower than expected, or where resource utilization exceeds 85%, as these often indicate potential bottlenecks.

Once you identify a constraint, validate it by analyzing the queue lengths and wait times at each workstation. Use the "What-If" analysis feature in Simcad to test different scenarios, such as adjusting staffing levels or changing process times, to see how these changes impact overall cycle time.

Finally, document your findings and continually monitor performance after implementing changes to ensure the bottleneck has been effectively addressed. Re-evaluate your KPIs regularly to maintain optimal performance in your manufacturing process.

Leave a comment

Pre-filled from your DNN account when signed in. You can change it before posting.

CAPTCHA image
Enter the code shown above in the box below.

Comments are moderated before they appear publicly.

Terms Of UsePrivacy Statement© 1992-2026 CreateASoft, Inc. All Rights Reserved.
Back To Top